Technical Service

Installation & Commissioning

All major equipment supplied by StarMed is professionally installed, commissioned, and calibrated by our certified biomedical engineers — ensuring safe, validated performance from day one.

Certified Biomedical Engineers On-Site

Proper installation and commissioning is not optional — it is the difference between equipment that performs reliably for years and equipment that fails prematurely or, worse, poses a risk to patients. Our biomedical engineering team is trained and certified by leading manufacturers to install their products to the highest standard.

We work alongside your biomedical maintenance team throughout the process, ensuring knowledge transfer and long-term ownership of every system we commission.

Equipment We Install

Operating theatre equipment (OT tables, surgical lights, anaesthesia machines)
ICU equipment (ventilators, patient monitors, infusion pumps)
Diagnostic imaging systems (X-ray, ultrasound, C-arm)
Laboratory analysers (haematology, biochemistry, microbiology)
Hospital beds and ward furniture assembly
Sterilisation and autoclave units
Dental equipment and dental chairs
Ophthalmic and ENT diagnostic workstations

Our Installation Process

01

Site Preparation Assessment

Before delivery, our engineers assess the installation site — checking electrical supply, space dimensions, environmental conditions, and any civil works required.

02

Physical Installation

Equipment is unpacked, assembled, and installed in accordance with manufacturer guidelines and local regulatory requirements.

03

Calibration & Testing

All equipment is calibrated to manufacturer specifications and subjected to full performance testing before clinical use is approved.

04

Acceptance Testing

Formal acceptance tests are conducted with your clinical and biomedical team present, confirming that all functions meet specification.

05

Documentation & Handover

We provide a full installation report, calibration certificates, equipment manuals, and a signed handover document.

06

Warranty Activation

Manufacturer warranty is formally activated upon commissioning sign-off, with warranty documentation issued to the client.

Documentation Provided

Installation Qualification (IQ) report
Operational Qualification (OQ) report
Performance Qualification (PQ) report where applicable
Calibration certificates
Equipment operation manuals
Preventive maintenance schedule
Spare parts list and contacts
Signed client acceptance certificate

Book an Installation

Installation is included in all capital equipment supply contracts. Contact us to schedule your on-site commissioning date.

Schedule Installation Also view: After-Sales Maintenance →