Full Theatre Setup — Rift Valley Nursing Home
The Challenge
The facility was opening a new operating theatre and needed a complete, integrated equipment package — from the OT table and surgical lights to the anaesthesia machine and electrosurgical unit — delivered, installed, and commissioned within 6 weeks.
Our Solution
StarMed sourced and supplied a full theatre package including a motorised OT table, dual-dome LED surgical lights, an integrated anaesthesia workstation, monopolar/bipolar ESU unit, and a complete set of general surgery instruments. Our biomedical team installed and commissioned all equipment on site.
The Outcome
The theatre was fully operational within 5 weeks of order confirmation — one week ahead of schedule. All equipment passed commissioning tests and clinical staff received hands-on training from our technical team.
120-Bed Ward Furniture Supply — Jubilee Hospital
The Challenge
A new 120-bed general ward required complete furnishing — hospital beds, bedside lockers, over-bed tables, ward screens, and medical trolleys — within a tight budget and a 6-week delivery window.
Our Solution
StarMed designed a cost-efficient furniture package combining electric multi-section beds for private rooms and manual hydraulic beds for general wards. All furniture was sourced from a single certified manufacturer, delivered in two consignments, and assembled on-site by our logistics team.
The Outcome
All 120 beds and accompanying furniture were delivered, assembled, and handed over within 6 weeks. The client received a consolidated delivery note, warranty certificates, and a post-installation satisfaction report.
KEMSA Framework — Consumables Annual Contract
The Challenge
A county health department required a reliable annual framework contract for high-volume consumables — syringes, IV sets, gloves, and wound care supplies — for 14 health facilities across the county, with guaranteed quarterly delivery.
Our Solution
StarMed secured a PPRA-compliant framework contract, establishing agreed pricing, delivery schedules, and quality standards. We maintained a local buffer stock of all fast-moving items to ensure quarterly delivery reliability regardless of import lead times.
The Outcome
Four consecutive quarterly deliveries completed on schedule and on budget. All 14 facilities received correct quantities with full batch documentation. Renewal of the framework contract was agreed for the following financial year.
Ready to be our next success story?